Ground teams at Kennedy Space Center prepared on Saturday for a second try at launching NASA's towering, next-generation moon rocket on its debut flight, hoping to have remedied engineering problems that foiled the initial countdown five days ago.
Launch controllers began filling the 32-story tall Space Launch System (SLS) rocket with fuel early on Saturday ahead of a 2:17 p.m. EDT (10:17pm UAE time) liftoff from Cape Canaveral, Florida, committing to a second attempt at a mission that will kick off NASA's ambitious moon-to-Mars Artemis program 50 years after the last Apollo lunar mission.
The previous launch bid on Monday ended with technical problems forcing a halt to the countdown and postponement of the uncrewed flight.
Tests indicated technicians have since fixed a leaky fuel line that contributed to Monday's canceled launch, Jeremy Parsons, a deputy program manager at the space center, told reporters on Friday.
Two other key issues on the rocket itself - a faulty engine temperature sensor and some cracks in insulation foam - have been resolved to NASA's satisfaction, Artemis mission manager Mike Sarafin told reporters on Thursday night.
Weather is always an additional factor beyond NASA's control. The latest forecast called for a 70% chance of favorable conditions during Saturday's two-hour launch window, according to the U.S. Space Force at Cape Canaveral.
If the countdown clock were halted again, NASA could reschedule another launch attempt for Monday or Tuesday.


Saudi Arabia, US launch strikes on Iran-backed armed groups in Iraq
Major wildfire stabilises in central Spain but rising temperatures bring new alerts
Rescuers in Japan haul survivors from collapsed mall as earthquake toll rises to 13
Two Greek firefighters killed as wildfires strike further east in Europe
Trump cites 'good' talks on Iran, reiterates threat to hit targets
